Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis

Product Details
After-sales Service: Available
Warranty: 1 Year
Certification: ISO 9001:2000
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
9
Year of Establishment
2008-01-11
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
  • Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
Find Similar Products

Basic Info.

Model NO.
XY-1/2/3
Condition
New
Drill Hole Diameter
250-300mm
Drill Hole Depth
>150m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Crawler
Diameter of Drill Pipe
42/50mm
Drilling Angles
90-75 Degrees
Kelly Bar
4.3m
Mud Pump
Bw160/250 Pump
Applications
Core Drilling/Soil Investigation/Civil Engineering
Color
Reddish Orange/Yellow/White/Green
Drilling Equipements
Drilling Tools, Drill Mast, Mud Pump and etc.
Material of Drilling Rods
Alloyed Steel/Alloyed Metal
Transport Package
Customized
Specification
1900X850X1490mm
Trademark
Bohwa
Origin
China
HS Code
8430490000
Production Capacity
30 Sets/Month

Product Description

Geoconstruction Hydraulic Chuck Spindle Drilling Rig with Tracked Chassis

I. Ap
plication


XY Series are the machines with sliding skid base multifunctional drilling machines. They can be used in:

1. Engineering geological investigation of railway, hydropower , bridge, dam foundation and other projects.
2. Geological core sampling drilling, soil investigation
3. Drilling of small grouting Confucius and blasting holes
4. Water well drilling


II. Features & Benefits

1. Installed with an oil pressure feeding mechanism to improve drilling efficiency and reduce labor intensity
2. The drilling rig is equipped with a ball-clamping clamping mechanism and a six-way active drill rod, which can be operated without downtime, with high work efficiency, convenient operation, safety and reliability.
3. Equipped with a hole bottom pressure gauge to indicate the pressure, which is easy to grasp the situation inside the hole.
4. The handles operation is easily to control by users.
5. The rig is compact in structure, small in size, light in weight, strong in decomposability, easy to move, and suitable for plains or mountainous areas.


III. Technical Specifications
No. Models No. Drilling Capacity Drilling Angles Drill Rod Diesel Engine Counter-clockwise Spindle Stroke Winch  Mud Pump
1 XY-1 75MM/100M 0-360 degrees 42mm  13.2KW 2200RPM   450mm 10KN Lifting Force Optional
2 XY-1S 75MM/150M 0-360 degrees 42mm  13.2KW 2200RPM   450mm   Optional
3 WD-100 75MM/100M 0-360 degrees 42/50mm 8.8KW       400mm 23KN Lifting Force Optional
4 XY-200 75MM/200M 0-360 degrees 42/50mm 16.2KW 2200RPM   500mm 20KN Lifting Force Optional
5 XY-240 75MM/240M 0-360 degrees 42/50mm 17KW    2200RPM  Available 500mm 25KN Lifting Force Optional
6 XY-300 75mm/300M 0-360 degrees 42/50mm 23KW    2200RPM  Available 510mm 30KN Lifting Force Optional

IV. Photos of Drilling Machine
Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked ChassisGeoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis
Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis

Package:
Geoconstruction Hydraulic Chuck Spindle Core Drilling Rig with Tracked Chassis

V. After-sales Service


1. Manual Book and Overseas Engineering Service Available
2. Spare Parts and Drilling Tools are Optional and Available
3. 6 - 12 Months Warranty for Main Components of Machine
4. 24 Hours Online Service ( WhatsApp and Email)


To save your time, please clarify with the information about the requirements on
1) Application on the rig 
2) Borehole depth and drilling hole diameters
3) Stratum (soil or hard rock with clays, Limestone? Or Granite?) 
4) Do you need rig on crawler base with drill must? The chassis and drill mast are optional.
5) Introduction about your company


Thanks for your support!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier